Bill: 119-HR7487
Rural Jobs and Hydropower Expansion Act
Last action: 8-27-2026
Version: 2026012515
Current status: Placed on the Union Calendar, Calendar No. 676.
Bill is currently in: House
Path to Law
House Senate President
Official info

No users have recorded support or opposition for this bill yet. Be the first.

Summary Provided by Congressional Research Service

No summary is currently available for this legislature.

Latest available text


1. Short title2. Amendments to Reclamation Project Act

1. Short title

This Act may be cited as the "Rural Jobs and Hydropower Expansion Act".

2. Amendments to Reclamation Project Act

Section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c); 53 Stat. 1194) is amended—

(1) by striking the subsection designation and inserting the following:

(c) Furnishing water to municipalities; sale of electric power; lease of power privileges -

(2) in paragraph (1), by striking "small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs" and inserting "hydropower using all Bureau of Reclamation facilities";

(3) in paragraph (2)(A)—

(A) by striking "applicable transferred conduit" and inserting "applicable transferred works facility";

(B) by striking "applicable reserved conduit" and inserting "applicable reserved works facility"; and

(C) by striking "power privilege offer for a small conduit" and inserting "power privilege offer for the";

(4) in paragraph (3), by striking "small conduit" and inserting "applicable";

(5) in paragraph (4), by striking "small conduit hydropower";

(6) in paragraph (6)—

(A) by inserting ", or the management of Bureau of Reclamation facilities specially authorized for hydropower generation" before ", as water used";

(B) by striking "conduit" before "hydropower generation";

(C) by striking "shall be deemed incidental to" inserting "shall be deemed secondary to"; and

(D) by striking "transferred conduit" and inserting "transferred works facility";

(7) in paragraph (7), by striking "conduit";

(8) in paragraph (8)—

(A) by inserting "(referred to in this section as an ""authorization"")" before "issued by the Federal Energy Regulatory Commission";

(B) by striking "August 9, 2013," and inserting "the date of the enactment of the ""Rural Jobs and Hydropower Expansion Act"; and

(C) by adding at the end "Any authorization issued by the Federal Energy Regulatory Commission with respect to a project shall remain in place until such authorization becomes inactive. As allowed by the Federal Energy Regulatory Commission, an authorization may be renewed and remain active. Once the authorization becomes inactive, project site jurisdiction shall shift to the Bureau of Reclamation exclusively.";

(9) by redesignating paragraph (9) as paragraph (10);

(10) by inserting after paragraph (8) the following:

(9) Nothing in this section shall expand or otherwise amend the Bureau of Reclamation lease of power privilege authorities outside the project boundary.

(11) in paragraph (10), as so redesignated—

(A) by striking subparagraphs (A), (C), (D), and (E);

(B) by redesignating subparagraph (B) as subparagraph (A); and

(C) by adding at the end the following:

(B) Reserved works facility - The term "reserved works facility" means those facilities owned by the Bureau of Reclamation where the Bureau of Reclamation has retained responsibility for carrying out operation and maintenance activities.

(C) Transferred works facility - The term "transferred works facility" means a project facility where the operations and maintenance of that facility is carried out by a non-Federal entity under the provisions of a formal operations and maintenance transfer contract.

August 27, 2026Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed